Marshall Ford
Austin, Texas
- Capacity
- 108 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- Lower Colorado River Authority
- City
- Austin
- County
- Travis County
- State
- Texas
- Operational date
- January 1941
- Balancing authority
- ERCO
Marshall Ford is a 108 MW hydroelectric power plant in Austin, Texas. Operated by Lower Colorado River Authority, it has been operating since 1941. The facility is located in Travis County, within the ERCO balancing authority.
Loading map…
Nearby hydroelectric plants in Texas
Denison
Hydroelectric · Denison, Texas · Operating · COD 1945
Toledo Bend
Hydroelectric · Burkville, Texas · Operating · COD 1969
Amistad Dam & Power
Hydroelectric · Del Rio, Texas · Operating · COD 1983
Buchanan Dam (TX)
Hydroelectric · Buchanan Dam, Texas · Operating · COD 1938
Granite Shoals
Hydroelectric · Marble Falls, Texas · Operating · COD 1951
Source: U.S. Energy Information Administration (EIA-860M)