Tulloch
Jamestown, California
- Capacity
- 29.9 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- Oakdale&South San Joaquin Irrigation D.
- City
- Jamestown
- County
- Tuolumne County
- State
- California
- Operational date
- June 1958
- Balancing authority
- CISO
Tulloch is a 29.9 MW hydroelectric power plant in Jamestown, California. Operated by Oakdale&South San Joaquin Irrigation D., it has been operating since 1958. The facility is located in Tuolumne County, within the CISO balancing authority.
Loading map…
Nearby hydroelectric plants in California
Castaic
Hydroelectric · Castaic, California · Operating · COD 1972
Helms Pumped Storage
Hydroelectric · Shaver Lake, California · Operating · COD 1984
Haiwee Pumped Storage Project
Hydroelectric · Olancha, California · Planned · exp. 2028
Shasta
Hydroelectric · Redding, California · Operating · COD 1944
Edward C Hyatt
Hydroelectric · Oroville, California · Operating · COD 1968
Source: U.S. Energy Information Administration (EIA-860M)