H Neely Henry Dam
Ohatchee, Alabama
- Capacity
- 72.9 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- Alabama Power Co
- City
- Ohatchee
- County
- Calhoun County
- State
- Alabama
- Operational date
- June 1966
- Balancing authority
- SOCO
H Neely Henry Dam is a 72.9 MW hydroelectric power plant in Ohatchee, Alabama. Operated by Alabama Power Co, it has been operating since 1966. The facility is located in Calhoun County, within the SOCO balancing authority.
Loading map…
Nearby hydroelectric plants in Alabama
Wilson Dam
Hydroelectric · Muscle Shoals, Alabama · Operating · COD 1925
Wheeler Dam
Hydroelectric · Town Creek, Alabama · Operating · COD 1936
Walter Bouldin Dam
Hydroelectric · Wetumpka, Alabama · Operating · COD 1967
Martin Dam
Hydroelectric · Dadeville, Alabama · Operating · COD 1927
Lewis Smith Dam
Hydroelectric · Jasper, Alabama · Operating · COD 1961
Source: U.S. Energy Information Administration (EIA-860M)