Brady
Fallon, Nevada
- Capacity
- 55.9 MW
- Status
- Operating
- Fuel
- Geothermal
- Technology
- Geothermal
- Operator
- Ormat Nevada Inc
- City
- Fallon
- County
- Churchill County
- State
- Nevada
- Operational date
- August 2002
- Balancing authority
- NEVP
Brady is a 55.9 MW geothermal power plant in Fallon, Nevada. Operated by Ormat Nevada Inc, it has been operating since 2002. The facility is located in Churchill County, within the NEVP balancing authority.
Loading map…
Nearby geothermal plants in Nevada
McGinness Hills
Geothermal · Austin, Nevada · Operating
McGinness Hills 3
Geothermal · Austin, Nevada · Operating
Tungsten Mountain
Geothermal · Fallon, Nevada · Operating
Dixie Valley
Geothermal · Fallon, Nevada · Operating
NGP Blue Mountain I LLC
Geothermal · Winnemucca, Nevada · Operating
Source: U.S. Energy Information Administration (EIA-860M)