Turner Energy Storage Project
Pullman, Washington
- Capacity
- 1.2 MW
- Status
- Retired
- Fuel
- Battery storage
- Technology
- Batteries
- Operator
- Avista Corp
- City
- Pullman
- County
- Whitman County
- State
- Washington
- Balancing authority
- AVA
Turner Energy Storage Project is a 1.2 MW battery storage power plant in Pullman, Washington. Operated by Avista Corp, the plant has been retired. The facility is located in Whitman County, within the AVA balancing authority.
Loading map…
Nearby battery storage plants in Washington
Greenwater BESS
Battery storage · TBD, Washington · Under construction · exp. 2026
Centralia Battery Energy Storage System
Battery storage · Bucoda, Washington · Under construction · exp. 2028
AGATE BESS
Battery storage · Poulsbo, Washington · Under construction · exp. 2027
Arlington Battery Energy Storage System
Battery storage · Arlington, Washington · Under construction · exp. 2026
MESA 2
Battery storage · Everett, Washington · Retired
Source: U.S. Energy Information Administration (EIA-860M)