NL MA - Division
Massachusetts
- Capacity
- 2 MW
- Status
- Operating
- Fuel
- Battery storage
- Technology
- Batteries
- Operator
- Standard Solar
- County
- Bristol County
- State
- Massachusetts
- Operational date
- September 2025
- Balancing authority
- ISNE
NL MA - Division is a 2 MW battery storage power plant in Massachusetts. Operated by Standard Solar, it has been operating since 2025. The facility is located in Bristol County, within the ISNE balancing authority.
Loading map…
Nearby battery storage plants in Massachusetts
Medway Grid
Battery storage · Massachusetts · Operating · COD 2026
Energizar BESS
Battery storage · Massachusetts · Under construction · exp. 2027
Taft BESS
Battery storage · Massachusetts · Under construction · exp. 2027
Salt Cod BESS
Battery storage · Massachusetts · Under construction · exp. 2028
Cranberry Point Energy Storage
Battery storage · Carver, Massachusetts · Operating · COD 2025
Source: U.S. Energy Information Administration (EIA-860M)